In order to properly provide for the orphans and vulnerable children under our care in Malawi, we must add a new dedicated classroom each year (until we reach 8 individual classrooms for the grades Standard 1-8). This is in addition to the dedicated nursery and preschool classrooms that we use inside the main building.
This new building provides us with 3 additional classrooms. The structure is complete. All that is lacking now is the plastering, doors, etc. This building should meet our needs through 2022 (we are 1 year behind on this building due to a lack of funds). Below are some pictures of the progress and where it stands today. Thank you for the continued prayers and support to care for these loving children in Malawi, Africa.

Drawing of the two school blocks facing each other – the middle part is an open, covered, corridor 
This shows the layout of the 2 classes 
Our hand making of concrete blocks for the school 
handmade concrete blocks 
footers 
Slab poured one bucket at a time – mixed by hand 
the first corner 
Hand welded door and window frames 
hand digging out for drainage 
Roof timbers 
2nd School Block 

Acts 3 compound Blantyre, Malawi
The building itself is complete. Now we have to continue with the lime and plastering of the inside, adding the doors, and glass on the windows, as well as finishing concreting the drainage ditch around the class-building. Pray that we are able to finish this building before the start of school in September. We will also need to provide desks for the students and teacher and class supplies.
Please let us know if you have any questions.